Summary:
The report provides a summary of the 2024-2025 activities of the BRIDGE Regulation Working Group (WG) which was established from the beginning of the BRIDGE initiative to foster knowledge sharing among projects funded by Horizon 2020 and Horizon Europe programmes in different regulatory aspects in the field of energy. The Regulation WG, as the entire BRIDGE initiative, structures its activities on a yearly basis. In the last years, different topics have been addressed, resulting in most cases in specific reports that can be shared not only within the BRIDGE community, but with a larger audience. The Regulation WG is a live group where projects join and leave as they evolve. This “staff rotation” facilitates a dynamic environment for the introduction of new topics of interest. The WG continuously looks for synergies with other BRIDGE working groups, and with those outside BRIDGE (ISGAN, ETIP SNET, …). The WG defines the most important regulatory challenges to be addressed, proposes best practices from the BRIDGE projects and formulates recommendations for policy makers. In addition, thematic knowledge sharing sessions are organised to present best practices from projects that are close to their end date.
Spanish layman's summary:
El informe resume las actividades 2024-2025 del Grupo de Trabajo de Regulación de BRIDGE, que promueve el intercambio de conocimiento entre proyectos europeos de energía, identifica retos regulatorios y formula recomendaciones de política basadas en buenas prácticas.
English layman's summary:
The report summarises the 2024-2025 activities of the BRIDGE Regulation Working Group, which fosters knowledge sharing among EU energy projects, identifies regulatory challenges, and formulates policy recommendations based on best practices.
Keywords: Smart Grids, electricity regulations, innovation projects.
IIT Project: BeFlexible (BeFlexible)
Funding entity: Comisión Europea. Horizon Europe
Publication date: 01-Oct-2025
DOI reference:
https://data.europa.eu/doi/10.2926/4143543
Citation:
H. Gerard, A. Pizzamiglio, D. Verez, D. Moneta, J.P. Chaves, M. Troncia, K. Laffont-Eloire, L. Guitart, S. Gallego, E.C. Ormeño-Mejía, "BRIDGE, Annual report of the Regulation Working Group 2024 - 2025". Project: BeFlexible / WP1/ T. 1. Funded by Comisión Europea whitin "Horizon Europe". Oct/2025. IIT-25-339I. doi: https://data.europa.eu/doi/10.2926/4143543